1. プロジェクトの概要

1.1 Project Positioning

This plan is designed for small‑scale mineral processing plants with a daily throughput of 30–100 tonnes. It is suitable for grinding and beneficiation of ores such as gold, copper, iron, and quartz sand. Small‑scale plants offer low investment thresholds, short construction periods, and flexible operation, making them an ideal choice for early‑stage mine development or when ore supply is inconsistent.

1.2 Design Principles

  • Controllable investment – core equipment investment kept in the range of RMB 0.8–1.5 million.
  • Mature technology – single‑stage grinding plus a single beneficiation circuit, avoiding excessive complexity.
  • Energy efficiency – priority given to energy‑saving equipment to reduce operating costs.
  • Expansion reserve – equipment selected with some spare capacity for future production increases.

2. Ore Characteristics and Process Route

2.1 Applicable Ore Conditions

パラメータ値
Ore typesGold ore, copper ore, magnetite, quartz sand, etc.
フィードサイズ≤20–25 mm
Target grind size60–80% passing 200 mesh (single‑stage grinding)
Grinding modeWet grinding (preferred) or dry grinding

2.2 Recommended Process Flowsheet

Single‑stage closed‑circuit grinding – beneficiation:

Run‑of‑mine → Jaw crusher → Hammer crusher → Vibrating screen → Ball mill → Spiral classifier (or hydrocyclone)
                                                                       ↓
                                                               Qualified pulp → Beneficiation (flotation / magnetic separation)
                                                                       ↓
                                                               Tails → Tailings pond
                                                               Concentrate → Dewatering

For small plants where the final grind of –200 mesh is below 80%, a single grinding stage is sufficient. The ground pulp is classified by a spiral classifier; the qualified product goes to the next process, while coarse particles are returned to the ball mill for regrinding.


3. Main Equipment Configuration and Quotations

3.1 Core Equipment – ボールミル Selection

Common ball mill models for small plants and their indicative prices:

モデル容量モーター出力Indicative Price (RMB 10,000)用途
Φ900×18000.5–2 t/h15–22 kW3–8Mini plant / laboratory
Φ1200×24001–3 t/h30–37 kW8–15Small plant
Φ1500×30003–8 t/h55–75 kW15–25Standard small plant
Φ1830×36005–15 t/h90–130 kW25–40Larger small plant

Note: Prices are market references as of 2025–2026. Actual costs vary with shell material, liner type, drive system, brand, and customisation. Small ball mills (drum diameter ≤1.5 m) typically range from RMB 80,000 to 250,000.

Recommended option for 50 t/d: Φ1500×3000 wet overflow ball mill with 55 kW motor – approximately RMB 180,000–250,000.

3.2 Complete Equipment List (for 50 t/d configuration)

いいえ。.設備Model / Specification電力Indicative Price (RMB 10,000)備考
1Vibrating feeder–1.5 kW2–4均一な給餌
2ジョークラッシャーPE‑250×40015 kW3–5Primary crushing
3ハンマークラッシャーPC‑400×60022 kW5–8Secondary crushing
4Vibrating screenDouble‑deck3 kW2–4Control feed size
5ボールミルΦ1500×300055 kW18–25Core equipment
6スパイラル分級機FG‑73 kW3–5Closed‑circuit classification
7Flotation cells (or magnetic separator)7 cells / drum type5.5 kW/cell10–20According to ore type
8Agitation tankΦ1500×15005.5 kW3–5Pulp conditioning
9増粘剤NZ‑62 kW3–5Concentrate dewatering
10Filter pressVacuum type3 kW3–5Concentrate drying
11Belt conveyors & accessoriesCustom–3–5Material handling
12Power distribution & controlComplete set–5–8Electrical control

Subtotal for equipment: approximately RMB 600,000–950,000

3.3 Laboratory‑Scale Equipment (optional)

If ore amenability testing or routine assaying is required, consider:

モデル説明Indicative Price
XMQΦ240×90Laboratory cone ball mill~RMB 6,000–7,000
XMQΦ400×600Medium‑size lab ball mill~RMB 10,000–20,000

3.4 Used Equipment Option

For very tight budgets, used ball mills are an alternative. Prices typically range from 40–60% of new equipment. A small used ball mill may cost as little as RMB 50,000 or over RMB 300,000 depending on condition and age. Inspect service life and maintenance records carefully.


4. Total Project Investment Estimate

4.1 Investment Breakdown (50 t/d flotation plant)

Cost CategoryAmount (RMB 10,000)Share備考
機器の購入60–9545–55%Ball mill, crushers, classifier, flotation, etc.
Civil works30–5020–30%Plant building, foundations, bins
インストール5–104–6%Equipment setting, piping
Electrical system5–84–5%Cabling, switchgear, controls
輸送3–82–5%Can be higher for remote sites
Spare parts & consumables3–52–3%Grinding balls, liners, etc.
Other costs (design, commissioning, training)5–104–6%Engineering services
Equipment + civil total110–185––
Working capital20–30–Ore purchase, labour, power, etc.
Total project investment130–215–Including working capital

Reference: For a 50 t/d small gold flotation plant, equipment investment is about RMB 650,000–850,000, civil and installation about RMB 300,000–400,000. A standard 100 t/d flotation plant typically totals RMB 0.8–3.0 million.

4.2 Investment by Scale

ScaleEquipment InvestmentTotal Investment (incl. civil)用途
30 t/dRMB 400,000–600,000RMB 800,000–1.2 millionMicro plant / pilot testing
50 t/dRMB 600,000–950,000RMB 1.3–1.8 millionStandard small plant
100 t/dRMB 800,000–1.3 millionRMB 1.8–3.0 millionLarger small plant

5. Operating Cost Analysis

5.1 Per‑tonne Processing Cost Estimate

原価項目Unit Cost (RMB/t)備考
電気15–25Grinding accounts for 40–60% of total plant power
Grinding media (balls)5–10Depends on ore hardness
Liner consumption2–4High‑manganese steel liners
Labour8–128–10 operators
Maintenance & repairs3–5Routine upkeep
Others (water, reagents, etc.)5–10プロセスに依存する
Total per‑tonne cost38–66–

Reference: Small flotation plants typically report ~RMB 55–70/t.

5.2 Annual Operating Cost (50 t/d, 300 working days/year)

  • Annual throughput: 50 × 300 = 15,000 tonnes
  • Annual operating cost: 15,000 × 50 = RMB 750,000 (approx.)

6. Economic Benefits Analysis

6.1 Revenue Estimate (gold ore example – for reference only)

Assume:

  • Feed grade: 3 g/t Au
  • Recovery: 85%
  • Annual throughput: 15,000 t

Annual gold production: 15,000 × 3 × 85% = 38,250 g = 38.25 kg
At a gold price of RMB 450/g, annual revenue: 38.25 × 1000 × 450 ≈ RMB 17.22 million

6.2 Payback Period

  • Total investment: ~RMB 1.5 million (mid‑range)
  • Net annual profit (after costs and taxes): highly variable depending on ore grade and commodity prices.
  • Typical payback for small plants: 1–3 years.

7. Implementation Schedule

PhaseTimelineActivities
PreliminaryMonths 1–2Ore amenability test, site selection, equipment sourcing
ProcurementMonths 2–3Enquiries, comparison, contracting, manufacturing
Civil worksMonths 3–5Plant construction, equipment foundations
インストールMonths 5–6Equipment positioning, piping, electrical
CommissioningMonths 6–7Single‑machine testing, linked trial run, pilot production
Formal productionMonth 7Reach design capacity

8. Risk Analysis and Mitigation

リスク要因影響Mitigation
Ore grade fluctuation高いStrengthen exploration, establish grade monitoring
Equipment breakdown中Keep key spare parts, secure after‑sales service agreement
Product price drop高いMonitor markets, control inventory levels
Stricter environmental policy中Install tailings pond and effluent treatment facilities
Rising energy costs中Use energy‑efficient equipment, optimise grinding parameters

こちらの商品もおすすめです

SF浮選機

SF浮選機

SF、BF浮選機、およびSF+JJF複合ユニット まず、…
車輪付き移動式砕石機

車輪付き移動式砕石機

FOUR COMBINATION MOBILE STATION シリーズ 標準モデル 搭載機器 搭載機器 処理能力(t/h) 輸送寸法(mm)…
小型移動式砕石機

小型移動式砕石機

はじめに ミニ移動式ジョークラッシャーは、極めてコンパクトな、クローラー式破砕機であり…
ロータリー乾燥機

ロータリー乾燥機

1. 製品概要 ロータリー乾燥機は、建材、冶金などの分野で広く使用されています……
Copyright © 2026 Oreprocessings. All Rights Reserved.